The Australian Pipelines and Gas Association (APGA) represents the owners, operators, designers, constructors and service providers of Australia’s pipeline infrastructure. APGA members ensure safe and reliable delivery of over 1,500 PJpa of gas consumed in Australia alongside over 4,500 PJpa of gas for export.
APGA welcomes the opportunity to contribute to the Australian Energy Market Commission’s consultation on implementing a Notice of Closure requirement for gas transport and delivery infrastructure connected to the East Coast Gas System (ECGS).
The proposal for a formalised notice of closure period for gas transmission infrastructure is reasonable, although potentially a solution in search of a problem. Any customer with a firm service contract will have a high degree of confidence the service will not close for the length of the contract. Further, this information is generally volunteered on the Bulletin Board as a factor that may affect medium-term capacity. Nevertheless, a formal obligation to publish would support capacity certainty.
APGA previously[1] recommended that 36 months would be an appropriate period to align with current uncontracted capacity outlook reporting for pipelines and production facilities. This aligns with both Option 1 and Option 2.
Both of these options have merits and potential costs. Option 2 would likely require changes to reporting systems for some participants, and hence additional costs, relative to Option 1. Given this APGA prefers Option 1. AEMO can provide further transparency by flagging reported closures and amendments to reported closure dates to market participants.
On scoping the notice requirement:
[1] APGA, 2023, Reliability and Supply Adequacy framework for the East Coast Gas Market, https://apga.org.au/submissions/reliability-and-supply-adequacy-framework-for-the-east-coast-gas-market