Pilbara Pipeline System
TABLE OF CONTENTS
loading...
The Pilbara Pipeline System (PPS) is located in NW Western Australia and is comprised of five transmission pipelines extending from the North West Shelf Joint Venture’s Karratha Gas Plant to Port Hedland. These are as follows:
- The 24km Burrup Extension Pipeline that links Woodside’s Karratha Gas Plant with the Pilbara Energy Pipeline at the Dampier to Bunbury Natural Gas Pipeline Mainline Valve 7, 20km south of Karratha.
- The 216km Pilbara Energy Pipeline that transports gas from the Burrup Extension Pipeline, along the Pilbara Coast to Port Hedland, where it interconnects with the Telfer Gas Pipeline.
- The 5km Karratha Lateral that transports gas to the Horizon Power Station at Karratha.
- The 6km HBI Lateral that transports gas from Port Hedland to Alinta Energy’s Port Hedland Power Station.
- The 0.2km Boodarie Gas Lateral that runs to the (now closed) Solomon CNG plant.
The PPS is owned and operated by APA Group. All sections of the PPS are non-scheme pipelines under Part 23 of the National Gas Rules.
Information categories
Pipeline Schematic
Read More
Read More
Gas Specification
Scroll down to Gas Specification heading in the Policies, Procedures and Requirements section on linked page.Read More
Read More
Services
Scroll down to the Capacity and Services section of the linked page.Read More
Read More
Standing prices
For specific PPS tariff information, scroll down table on linked page to Pilbara Energy Pipeline section.Read More
Read More
Service usage information (monthly)
For specific PGP service usage information, scroll across to Western Australia / Parmelia Gas Pipeline in the linked document.Read More
Read More
Capacity outlook (AEMO Gas Bulletin Board)
To view information in respect of the capacity outlook, navigate to the Capacity tab of the data table. Select the checkbox Medium Term Capacity Outlook in the left-hand navigation pane. The capacity outlook data will then be displayed in the data table. (Note: to ensure that you are only viewing Medium Term Capacity Outlook information, deselect any other selected items in the left-hand navigation pane).Read More
Read More
Capacity outlook next 12 to 36 months
For specific PGP capacity outlook information (on APA website), scroll across to Western Australia / Parmelia Gas Pipeline in the linked document.Read More
Read More
Financial information
Scroll down to the APA Financial Information Disclosure – Part 23 National Gas Rules section of the linked page.Read More
Read More
Weighted average price information
Scroll down to the APA Financial Information Disclosure – Part 23 National Gas Rules section of the linked page. WAP table specifically included in attached PGP…Part 23 Financial Reporting spreadsheet.Read More
Read More
User access guide
Read More
Read More
Standard OTSA for each Part 24 facility
Read More
Read More
Metering and measurement
Read More
Read More