Skip to content
Close
PILBARA PIPELINE SYSTEM

Pilbara Pipeline System

The Pilbara Pipeline System (PPS) is located in NW Western Australia and is comprised of five transmission pipelines extending from the North West Shelf Joint Venture’s Karratha Gas Plant to Port Hedland. These are as follows:

  • The 24km Burrup Extension Pipeline that links Woodside’s Karratha Gas Plant with the Pilbara Energy Pipeline at the Dampier to Bunbury Natural Gas Pipeline Mainline Valve 7, 20km south of Karratha.
  • The 216km Pilbara Energy Pipeline that transports gas from the Burrup Extension Pipeline, along the Pilbara Coast to Port Hedland, where it interconnects with the Telfer Gas Pipeline.
  • The 5km Karratha Lateral that transports gas to the Horizon Power Station at Karratha.
  • The 6km HBI Lateral that transports gas from Port Hedland to Alinta Energy’s Port Hedland Power Station.
  • The 0.2km Boodarie Gas Lateral that runs to the (now closed) Solomon CNG plant.

The PPS is owned and operated by APA Group. All sections of the PPS are non-scheme pipelines under Part 23 of the National Gas Rules.

General information about the Pilbara Pipeline System.

Line map of pipeline.

pilbara_line_map

 

Commercial contact information

Contact APA Group on 08 6189 4300 or via email

Information categories

Pipeline Schematic

Read More
Read More

Gas Specification

Scroll down to Gas Specification heading in the Policies, Procedures and Requirements section on linked page.Read More
Read More

Services

Scroll down to the Capacity and Services section of the linked page.Read More
Read More

Standing prices

For specific PPS tariff information, scroll down table on linked page to Pilbara Energy Pipeline section.Read More
Read More

Service usage information (monthly)

For specific PGP service usage information, scroll across to Western Australia / Parmelia Gas Pipeline in the linked document.Read More
Read More

Capacity outlook (AEMO Gas Bulletin Board)

To view information in respect of the capacity outlook, navigate to the Capacity tab of the data table. Select the checkbox Medium Term Capacity Outlook in the left-hand navigation pane. The capacity outlook data will then be displayed in the data table. (Note: to ensure that you are only viewing Medium Term Capacity Outlook information, deselect any other selected items in the left-hand navigation pane).Read More
Read More

Capacity outlook next 12 to 36 months

For specific PGP capacity outlook information (on APA website), scroll across to Western Australia / Parmelia Gas Pipeline in the linked document.Read More
Read More

Financial information

Scroll down to the APA Financial Information Disclosure – Part 23 National Gas Rules section of the linked page.Read More
Read More

Weighted average price information

Scroll down to the APA Financial Information Disclosure – Part 23 National Gas Rules section of the linked page. WAP table specifically included in attached PGP…Part 23 Financial Reporting spreadsheet.Read More
Read More

User access guide

Read More
Read More

Standard OTSA for each Part 24 facility

Read More
Read More

Metering and measurement

Read More
Read More

Subscribe for Updates

Subscribe to our mailing list and be the first to access exclusive industry updates, event announcements, and special offers tailored for professionals in the pipeline and energy sector.