Darling Downs Pipeline
TABLE OF CONTENTS
loading...
The Eastern Goldfields Pipeline System (EGPS) in central Western Australia is owned and operated by APA Group. The EGPS comprises the Murrin Murrin Lateral and four transmission pipelines. Key details of each component of the system are as follows:
- The 85 km Murrin Murrin Lateral (MML) is connected to the Goldfields Gas Pipeline and transports gas to the Murrin Murrin mine site approximately 69 kilometres east of Leonora, and to the Eastern Goldfields Pipeline.
- The 293km Eastern Goldfields Pipeline (EGP) connects the Murrin Murrin Lateral Pipeline to the Sunrise Dam, Tropicana and Granny Smith Gold Mines in the Eastern Goldfields Region of Western Australia. Construction of the EGP was completed in 2015.
- The 5.7km Gwalia Lateral delivers gas from the Murrin Murrin Lateral to the Gwalia mine site just south of Leonora.
- The 5km Mount Morgans Gas Pipeline delivers gas from the Eastern Goldfields Pipeline to the Mt Morgan Gold Mine, approximately 20 kilometres west of Laverton.
- The 198km Yamarna Gas Pipeline runs from the Eastern Goldfields Pipeline to the Gruyere Gold Mine site in the eastern Yilgarn.
The EGPS is a non-scheme pipeline under Part 23 of the NGR.
General information about the Eastern Goldfields Pipeline System.